Why Laying Over Builder's Sand Fails Within Months
One of the sharpest ways cut-price installers shave R80–R120/m² off a quote is scraping dead grass briefly and dumping 20mm of soft river or plaster sand over native earth instead of excavating and importing crushed stone. Within one Highveld summer rainstorm:
- Sand washes and settles unevenly: Rounded sand grains do not mechanically interlock; footsteps, heavy outdoor chairs, and pet running paths carve lasting hollows.
- Black clay expands beneath thin fills: Hartbeespoort valley soils swell when soaked and shrink in July drought, buckling loose shallow mats.
- Nutgrass and kikuyu punch up cleanly through bare soil: Unless deep stolons are dug out 70–100mm down and capped beneath non-woven geotextile fabric, weeds break right through drainage holes in the latex backing.
Preparing Existing Concrete or Brick Paving
When fitting 20mm Eco or 25mm landscape turf over an existing structural concrete stoep, balcony, or sound interlocking brick paving, deep excavation is unnecessary—but preparation still matters:
- Check ponding during light hose spray: Any concrete dip holding standing rainwater must be levelled with polymer screed before turf is glued down, or damp pockets smell after rain.
- Paver joint undulations: Deeply bevelled cobbles can shadow visibly through thin 10mm or 20mm carpets unless levelled thinly or paired with thicker 25mm–35mm backed yarn.
- Edge clearance at sliding doors: Always check bottom aluminium sliding-door clearances before choosing 35mm or 40mm pile height right up against patio thresholds!